Uploaded image for project: 'OpenDJ'
  1. OpenDJ
  2. OPENDJ-5265

Backport OPENDJ-4988: Topology wide inter process deadlock during long running replicated update stress tests

    XMLWordPrintable

    Details

    • Bug
    • Status: Dev backlog
    • Blocker
    • Resolution: Unresolved
    • 5.5.0
    • None
    • replication
    • None

      Description

      Found using OpenDJ 6.0.0 M120.7

      We found this issue running long stress tests (for 1.5 days) doing:

      • modify operations on split DS/RS topology
      • add/del operations on standard topology (combined DS/RS)

      For instance on the modify test on split DS/RS topology, we noticed that the two DS are blocked and are not accepting new operations => the modrate tool output shows a recent throughput of 0 and 0 errors.
      We have not errors in the DS and RS logs.

        Attachments

          Issue Links

            Activity

              People

              cjr Chris Ridd
              cjr Chris Ridd
              Christophe Sovant Christophe Sovant
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Created:
                Updated: